Kaneb Terminals
Background:
The project called for the demolition and site clearance of fuel storage tanks and a former fuel storage complex within Leith’s historic Imperial Docks. There was an additional requirement for groundworks to prepare the site for redevelopment.
Challenges:
- Complex site with multiple industrial structures
- Potential risk of oil contamination
- Asbestos located throughout the site.
Solutions:
- The project team needed to put together a detailed plan to logically sequence the dismantling, demolition, site clearance and groundworks for this technically challenging site.
- Dismantling and removal of all above-ground storage tanks.
- Dismantling and removal of all associated pipe-work and pipelines.
- Dismantling and removal of all overhead supporting gantries and lighting towers.
- Removal and consigned disposal of asbestos cement sheet roof coverings from loading bays.
- Removal of loading bay canopies.
- Demolition and removal of all above-ground plinths and bund walls to the level of existing surrounding ground.
- Crushing suitable demolition debris arising from our on-site operations.
- Backfilling voids with recycled aggregate.
This complex, multiphase demolition was completed safely and on schedule.